The semi semi-automatic closing interval, the long train head over the outbound signal generator (the track circuit not on the outbound side of the station).
Gate management principles: 3.5 to 4.95 M by crystals of sinusoidal oscillation, dividing by the frequency divider is about 7.8 K sine wave, the triode power amplifier input after door plank with coil (7) large coil electromagnetic launch, by the gate 1-6 area to receive coil respectively. After receiving, the received signal are compared with those of the reference signal, found that after the change, change the acquisition card output level, the CPU in 300 milliseconds for 6 location data acquisition card scanned, determine the metal's location and output display
New Car Buying Tips--
2005 mercedes s350
mercedes shoes
6x6 mercedes price
rab motors mercedes
c class mercedes coupe for sale
Copyright ?1998-2017 Technews Corp, All rights reserved
|